News

NEWS

  1. TOP
  2. News
  3. Detailed
  • お知らせ

Train operation resumes

2023.07.01

Today, due to the influence of heavy rain, the operation has been suspended from the first train, but we will resume operation from the following flights.

(Up)
Shimabara Port Station departure 8:46 Isahaya
Honisahaya Station departure 8:40 Isahaya
(downlink)
Isahaya Station 9:00 bound for Shimabara Port

(As of 7/1 8:20)